Clay Fill

Satisfaction Guaranteed Every time

Clay Fill

(Use Yardage Calculation Chart Below)

Clay Fill is the material used to fill holes and low areas or build up ground elevation on construction sites. Subsoil, which is found 12″ below, is called fill dirt. It consists of partially broken-down soil that contains clay, sand, silt, and stones, and any other materials found in the source ground. Clay fill is fill dirt that contains more than 50% clay.

Order By Phone

Material Price

Material Price: $15 / YD

Yardage Calculation Chart

To use this chart, determine the square footage of the area and look for the number to the left side of the chart. Then determine the depth of the topsoil or mulch you feel is needed and find that number along the top of the chart. Where the two boxes intersect will be the approximate cubic yards of topsoil or mulch needed. Remember, when using the chart for topsoil or stone calculations; add 20% to the yardage recommended on the chart to account for compaction.

--1"2"3"4"5"6"7"8"9"10"11"DEPTH
1000.50.7511.251.522.252.52.7533.5--
1500.511.522.52.753.253.754.254.755--
2000.751.2522.533.754.555.56.256.75--
2500.751.52.5344.755.56.2577.758.5--
300122.753.754.755.56.57.58.59.2510--
35012.253.254.55.56.57.758.759.751112--
4001.252.53.7556.257.58.751011.2512.513.75--
4501.534.255.7578.59.7511.2512.51415.5--
5001.534.756.257.759.2510.7512.51415.517--
60023.755.757.59.2511.75131516.7518.520.5--
7002.254.56.58.75111315.2517.2519.521.7524--
8002.557.51012.51517.5222.2524.7527.25--
90035.758.511.251416.7519.522.25252830.75--
10003.256.759.512.515.518.521.7524.75283134--
20006.2512.518.524.75313743.2549.555.561.7568--
30009.2518.5283746.555.75657483.592.75102--
500015.53146.561.7577.2592.75108123.5139154.5169.75--
SQ / FT------------------------

New Business Hours

As of November 22, 2024, we will be closing for the season.

We will be open by chance or appointment. We will re-open for the 2025 season March 17th, 2025.

Our Current Business Hours Are:
Monday-Friday: 8am-4pm